Part of the Urban Development of over 60 Kilometers of road works along Riyadh Metro Package 3, utilities infrastructure are being upgraded covering potable water systems, storm water drainage systems, irrigation systems, fire fighting network, sewage systems and power networks (MV-LV) of 20 Metro Stations, 2 Park and Ride Buildings, and 2 Depots.